JOSIF Main Page | JOSIF Platform | Prototype CTK RI Project
Introduction
UPDATE 28 FEB 2012 THE HOSTED RI and CTK are NOW AT
The RI /CTK framework is being developed in parallel with the RAM CTK for the 2011 Orlando RAM catalyst. At each snapshot different functionality will be made available which will be documented here.
Both the CTK and RI are now hosted on line for demonstrations.
CTK Test Runner Requirements Overall requirements for CTK test framework and how to build the snapshot CTK
RI Requirements Overall requirements for RI framework and Explains how to run the snapshot RI and connect to the on-line hosted RI
Building Snapshots Instructions for checking out and building RI and CTK snapshots
Note that presently the JOSIF code used in RAM is open source but the RAM RI/CTK is being developed in the TM Forum members only repository <RAM Repository> which is at https://collab.tmforum.org/svn/repos/tip . The RAM code will be made available on this site pending TM forum board approval. And we will be be moving all of the RI/CTK code to the SPM interface which is available on this site.
NOTE C Gallen - 24/8/11 details of the opennms interface are provided at OpenNMS RI
NOTE C Gallen as of 24/8/11 the RI and CTK builds with latest soap plugin
project Plan
Project plan for RI /CTK framework in support of RAM (2 week sprints until month before TMW when 1 week sprints )
Sprint |
Date |
Deliverable |
Deliverable |
Deliverable |
Status |
---|---|---|---|---|---|
1 |
8 Aug 2011 |
||||
2 |
22 Aug 2011 |
Status |
|||
3 |
5 Sept 2011 |
Prototype RI and prototype CTK client illustrating iterator and list of alarms (Pierre) |
|
Status |
|
4 |
19 Sept 2011 |
Linking of alarm list changes in persistence layer and to change events (Craig/Pierre) |
|
Status |
|
5 |
3 Oct 2011 |
|
|
Status |
|
6 |
10 Oct 2011 (1 week sprint) |
|
|
|
Status |
6 |
17 Oct 2011 (1 week sprint) |
|
|
Status |
|
7 |
31 Oct 2011 (1 week sprint) |
|
|
|
Status |
8 |
7 Nov 2011 |
Management World Americas 2011 Tuesday, November 08 |
|
|
Status |